How do I schedule an inspection after my permit is issued?
Knowing which inspection to request
Inspections happen at specific stages, such as before walls are closed, after rough-in plumbing or electrical is done, or at final completion. Your permit or the approved plans usually list the required inspections. Requesting the wrong stage can waste a visit and delay your schedule.
Some jurisdictions require the permit to show a posted card or record with the inspection list. Check your permit paperwork so you know what the inspector expects to see.
Preparing before the inspector arrives
Make sure the work is fully accessible and clean enough for the inspector to see the key details. Keep the approved plans, the permit, and any required documents on site. Clear a path to the work area, and let the inspector know if there are pets or access restrictions.
Do not cover the work until it has passed. Drywall, insulation, or flooring installed before inspection can force you to open walls again at your own expense.
Scheduling windows and follow-up
Inspection windows vary. Some departments offer a morning or afternoon slot, while others give a general arrival range. Ask for the expected timing when you book, and confirm whether someone needs to be home.
After the visit, the inspector will record a pass or a correction list. Review the notes immediately and ask questions if anything is unclear.
Common mistakes
- Calling for an inspection before the work is actually ready
- Covering walls or floors before the required inspection passes
- Forgetting that some inspections need the permit number at the door